Add what you know
One thing you learned the hard way. It gets published with your name on it, and it stays yours — we never merge it into an average.
By posting you confirm this is your own experience and contains no client, project or employer names. We may edit for clarity or hold it back. Your entry is never merged into an average — it keeps your name and its conditions. Remove it any time via privacy@gridopedia.com. Terms.
Be among the first 20 contributors. There's something in it for you beyond the credit.
The kind of thing that helps
Written by us to show the shape — not real submissions
Blockwork above level 20 runs about 30% slower than the ground floors and it isn't the masons — it's hoist queuing. If you're planning a tower, split the blockwork rate at whatever floor the second hoist gets reassigned to the façade. We didn't, and the last eight floors ate our float.
Field note · UAE · high rise
0.85 mh/m² for 200mm blockwork, crew of 10, normal ground-floor conditions, measured over four typical floors. Summer with the midday break it went to 1.05 on the same crew.
Rate · KSA · 8 floors sampled
Your page on retained logic says P6 keeps the original relationships — true, but it's worth saying that the setting is per-project, not global, so copying a project doesn't carry it. Cost us a week of arguing about why two files gave different dates.
Correction · retained-logic-vs-progress-override
Rather just email it? hello@gridopedia.com. Same credit, same terms.