Nine schedule tools

DCMA checks, baseline review, three-file progress audits, S-curves, logic integrity. All nine are built and in final testing on real programmes before they open.

When they land, each one will work two ways: online, in the tab you already have open, and downloadable — a single file you save once and run offline forever, on a laptop with no admin rights and no internet.

The online version is free and asks nothing of you. The download asks for an email, so we can tell you when a newer revision exists — an offline copy has no other way to know.

Get them first

One email per release. Offline downloads go to this list before anyone else.

Schedule Health Check

The fourteen DCMA checks on any P6 file in about two seconds, each result explained in plain words.

Baseline Submission Check

74 automated checks before you submit, plus 12 document checks the file cannot answer.

Progress Report Generator

Three files in — baseline, last period, current — and a printable monthly report out, with a 26-check integrity audit that catches reversed progress and moved actual dates.

XER to Excel Converter

A readable seven-sheet workbook. Codes decoded into words, hours converted to days, logic written out as text.

S-Curve Generator

Early, late, planned and actual curves, exported to Excel with a real native chart rather than a picture.

WBS Activity Table

WBS-nested or flat, 31 selectable columns, multiple files in tabs. Handles 30,000 activities.

Longest Path Finder

The top five longest paths through the network, so you can see what is actually driving the date.

Out-of-Sequence Detector

Every out-of-sequence relationship, with the two dates that prove it — and a warning when Progress Override is hiding a late project.

Logic Integrity Check

Dangling activities, redundant relationships and circular logic. Finds the activities whose duration cannot affect the end date, which no open-ends check catches.

Founding members — the first 20

The first twenty contributors get:

  • Your name and one link on the contributors page, permanently
  • That link can point at your own templates, course or consultancy — we take nothing and hold nothing
  • Every tool, and the offline downloads, before they go public
  • Your questions decide what gets built next

Why browser-only

The reason this exists at all

Most P6 toolkits are macro-enabled Excel add-ins or Windows executables, and on a laptop your employer controls that is usually where it ends. A handful of free browser viewers will open an .xer and draw a Gantt — none of them runs the fourteen DCMA checks, audits three files against each other, or tells you what the result means. These do both: the check, and the page explaining the check.

These run in the browser. The .xer file you load is read on your own machine and never sent anywhere — not to us, not to anyone. That is not a privacy policy, it is how the tool is built: there is no server to send it to.

Tell us what to build next

The list is not fixed

If one of these nine is close to what you need but not quite it, or the tenth one is obvious to you and missing here, say so: hello@gridopedia.com. Requests from working planners decide the order these ship in.